Deadline Anchors
Oderco Deadline Anchors are designed in accordance with API-8C and DNV-OS-E101.
- Mounted on the drill floor
- Mounted on the mast or derrick leg
- Deadline load up to 200,000 lbs
- Compression or tension load sensors
- Analyzed with Cosmos (FE Program) to minimize the sizes and weights.



We are ready to start your project
ZODRECO specializes in the engineering, design and manufacturing of oilfield drilling equipment and rig packages. Provided are engineering and design services for various topsides of fixed and floating offshore structures.
We're here to help you get started in the right direction with your project.
Request a Quote
After we get some information from you, we’ll set up a time to discuss your project in further detail.
How to contact us
