Deadline Anchors

Oderco Deadline Anchors are designed in accordance with API-8C and DNV-OS-E101.

  • Mounted on the drill floor
  • Mounted on the mast or derrick leg
  • Deadline load up to 200,000 lbs
  • Compression or tension load sensors
  • Analyzed with Cosmos (FE Program) to minimize the sizes and weights.
image
image
image

We are ready to start your project

ZODRECO specializes in the engineering, design and manufacturing of oilfield drilling equipment and rig packages. Provided are engineering and design services for various topsides of fixed and floating offshore structures.

We're here to help you get started in the right direction with your project.

Request a Quote

After we get some information from you, we’ll set up a time to discuss your project in further detail.

    How to contact us

    ZODRECO HEADQUARTERS

    3810 Beaumont Avenue,
    Liberty, Texas 77575
    Find Us on Map

    ZODRECO FABRICATION/RIG-UP FACILITY

    9470 FM 1960,
    Dayton, Texas 77535
    Find Us on Map

    Direct Line Numbers

    Our Email